Welcome to Shanghai Heyi forklift Co.,Ltd

ProductsProduct Center

Hangzhou forklift 45t container front crane

Products

The container front crane is composed of three parts: construction machinery chassis, telescopic boom and container spreader. The chassis includes engine, power shift gearbox, front axle, rear axle, steering system, cab, frame, counterweight and wheels; Telescopic boom has telescopic oil cylinder, pitching oil cylinder, boom and other components; Container slings have rotating mechanism, upper frame, connecting frame, underframe, telescopic frame, telescopic oil cylinder, anti sway oil cylinder, side shift oil cylinder, rotary lock oil cylinder and other components.

The front of the container is equipped with retractable and left-right rotating container slings, which can be used for 20 foot and 40 foot container loading and unloading operations. The front crane does not have to be vertical to the container when lifting the container, and can be operated at an angle with the container. After lifting, the spreader can be rotated to pass the

1.jpg

A narrow passage. At the same time, the spreader can be moved by 800mm to the left and right, so as to facilitate the alignment of the box during lifting and improve the operation efficiency. For freight stations with poor site conditions, the front crane can also operate normally.

The telescopic boom can be loaded with luffing. The take-off and landing of the container is completed by the telescopic and luffing of the boom. When the boom is extended and the pitching oil cylinder is extended, the lifting speed is faster. When the boom is lowered, it is locked at the same time, so that a faster lowering speed can be obtained. During operation, it can realize the whole vehicle walking, luffing and boom expansion and contraction at the same time, with high work efficiency.